Job completed for Kathleen S.
Completion date: November 30, 2020
Location: Arlington, VA
Why did the customer contact us?
Front room has water entering around multiple corners at the cove joint.
Solutions provided:
Install GrateDrain system along the front buttress wall to both ends and down to the wall adjacent to the central basement room. Includes flexi flange with holes drilled in block pockets to direct water into the drain system. Install check valve, high water alarm. All work is covered with high strength concrete and flush ports for servicing if needed. Discharge through the right front area of the home just outside of the garden into a drain box flush in soil.